Sports

All our coverage: Bills vs Colts will have big-time impact on AFC Playoff Picture

Syndication: Rochester

The Buffalo Bills (6-3) and Indianapolis Colts (5-5) will meet on Sunday in Orchard Park in a rematch of a sport on the identical discipline throughout final season’s playoffs. The Bills gained that Wild Card spherical sport, nevertheless it was nearer than numerous people thought. This time, each groups are combating for playoff place within the crowded AFC.

Buffalo obtained proper final week after dropping to the Jacksonville Jaguars whereas the Colts have gained 4 of 5, albeit in opposition to dangerous groups.

Accidents and COVID-19 will actually impact this sport, because the Bills are coping with some important losses. Massive run-stuffer Star Lotulelei is more likely to be out after being positioned on the Reserve/COVID-19 record, and the Colts are among the best operating groups within the league. Additionally sidelined on the COVID-19 record is beginning proper sort out Spencer Brown, whose absence two weeks in the past was a catastrophe for the Bills. Linebacker Tremaine Edmunds hasn’t practiced in additional than per week, and missed Wednesday and Thursday with a hamstring damage. Banged up Cole Beasley appears like he will have the ability to give it a go.

On the Colts, in addition they have accidents. Darius Leonard is coping with an ankle and hand damage and Braden Smith has an elbow damage. Eric Fisher, Dayo Odeyingbo, and TJ Carrie all missed follow Wednesday and DeForest Buckner was listed with 3 separate accidents whereas not training.

The Bills are favored by a landing at dwelling according to our friends at DraftKings SportsBook.

Odds/traces topic to vary. T&Cs apply. See draftkings.com/sportsbook for particulars.

Try all of our protection for the sport within the hyperlinks under.

Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button